Eichleay was contracted by Genentech to provide a GMP Warehouse and Product Distribution Center including site selection, design, and construction/remodeling of an existing remote facility.
The scope of work included construction and validation of a 29,000 sf, pallet cold room with temperature and humidity controls, the remodel and refurbishment of 80,000 sf of existing warehouse and office space, the installation of validated ambient space HVAC temperature and humidity control systems (providing redundancy for all validated systems), and the commissioning and validation of the facility to GMP and FDA requirements. Major construction and validation of the cold room, distribution operations, and office space were completed ten weeks ahead of schedule. The Wholesale License from the Kentucky Board of Pharmacy was received eight weeks ahead of schedule and the first finished product was shipped eight weeks ahead of schedule.
ahead of schedule on major construction
Kentucky Distribution Center (KDC)
Eichleay excels at efficiently executing technically complex, fast-track projects that involve many disciplines.
Save money, reduce risk, and speed completion of your project with Eichleay. Contact us to learn how our talented team of versatile professionals could help you.